Infrared Sauna Room Design, Construction, and Installation
Contact Info
- Add:沈阳市铁西区兴顺街99号, Zip:
- Contact: 周钢
- Tel:15998823135
- Email:1304239360@qq.com
Other Products
Liaoyuan Hanjiong Room, Dongfeng Beauty Sauna Center, Dongliao Fire Dragon Bath
Detailed Construction Process of Liaoyuan Hanjiong Room
I. Preliminary Planning and Design
Site Selection and Space Assessment
Applicable Scenarios: Home use (3-8㎡), commercial use (15-50㎡), or comprehensive wellness centers (requires integration with SPA and shower areas).
Basic Requirements: Ceiling height ≥2.3 meters, wall load-bearing capacity ≥150kg/㎡, independent electrical circuit (220V/380V), pre-installed drainage system.
Avoid proximity to water sources, gas pipelines, or wooden structures (additional fireproofing required).
Type Selection and Functional Design
Mainstream Types:
Far-infrared Hanjiong Room (heated by far-infrared light wave tubes/far-infrared heating cables, temperature 40-60°C)
Salt Therapy Hanjiong Room (Himalayan salt bricks + negative ion system)
Jade Hanjiong Room (paved with Xiuyan jade/maifan stone, magnetic therapy function)
Smart Configuration: Automatic temperature and humidity control.
II. Material and Equipment Procurement
Core Material List
Category Recommended Material Technical Parameters
Insulation Layer Extruded Polystyrene Board (XPS) Thickness ≥2cm, Fireproof Grade B1
Heating System Far-infrared Light Wave/Alloy Heating Cables Power 450-550W/㎡, IP67 Waterproof
Decorative Surface Fir/Scots Pine (Home Use), Salt Bricks Moisture Content ≤12%, No Formaldehyde Emission
Auxiliary Equipment
Electrical System: Leakage Protection Circuit Breaker (30mA operating current), Thermal Fuse (automatic cutoff at 70°C).
III. Construction Process (Taking Far-infrared Hanjiong Room as an Example)
Foundation Construction Phase (3-5 days)
Insulation Layer Installation: XPS board splicing, protective layer installation.
Circuit Pre-embedding: Zoned wiring for heating system (each zone ≤8㎡), reserve junction box for temperature controller.
Main Installation Phase (7-10 days)
Heating System Installation: Heating system setup, base layer protection.
Decoration Work: Exterior finishing of Hanjiong Room (leave 2mm expansion gap), salt brick walls require wooden frame fixation.
Equipment Integration: Smart constant temperature control system, infrared temperature sensor (error ±2°C).
IV. Debugging and Acceptance Standards
Functional Testing
Heating Test: Room temperature rises from 20°C to 55°C; slightly slower immediately after construction, please be patient.
Safety Inspection: Insulation resistance measured with megohmmeter ≥50MΩ, leakage current <0.75mA.
Energy Efficiency Evaluation: Continuous operation for 8 hours consumes ≤15 kWh (standard 10㎡ room).
V. Operation and Maintenance Key Points
Daily Management
Ventilate by opening the door after daily use to release moisture.
Wipe decorative surfaces monthly with a slightly damp cloth.